S. Barbara 1 agrivoltaic plant in Scalea

The S. Barbara 1 project involves a 5.99 MWp agrivoltaic plant in Scalea. The site inspection carried out on 13 July 2026 records the preparation of the area and its setting ahead of the next construction stages.

Aerial view of the S. Barbara 1 agrivoltaic project area in Scalea

Sinergia Group - sopralluoghi cantieri, luglio 2026

Location
Scalea (CS), Calabria
Status
Site preparation
Power
5.99 MWp
Companies
NESS S.p.A. Società Benefit
Year
2026

S. Barbara 1 is one of the agrivoltaic initiatives being delivered in Scalea. The planned capacity is 5.99 MWp, and NESS S.p.A. Società Benefit is the Group operating company involved in construction activities.

Construction status

Images collected during the 13 July 2026 inspection show the site preparation stage. They record the land profile, access routes and relationship with crops and infrastructure in the surrounding area. This stage precedes installation of the structures and modules and does not mean that the plant has been commissioned.

A project integrated into its setting

An agrivoltaic configuration requires energy design and land management to be considered together. Site organisation, accessibility and structural layout are therefore coordinated with the physical and productive characteristics of the area.

Verifiable updates

This page will be updated as subsequent milestones are reached, distinguishing construction, completion of installation and any future commissioning. This keeps each published statement linked to a documented stage of the project.