Camigliatello 1-2-3 integrated agrivoltaic hub
Camigliatello 1, 2 and 3 are three adjacent 2.99 MWp agrivoltaic plants, totalling 8.97 MWp. Images dated 14 July 2026 document installed modules and structures across the three coordinated areas.

Sinergia Group - sopralluoghi cantieri, luglio 2026
- Location
- Camigliatello, Calabria
- Status
- Installation completed
- Power
- 8.97 MWp
- Companies
- NESS S.p.A. Società Benefit
- Year
- 2026
Camigliatello 1, Camigliatello 2 and Camigliatello 3 form an agrivoltaic hub comprising three adjacent units. Each plant has a capacity of 2.99 MWp, for a combined 8.97 MWp. Construction activities involve NESS S.p.A. Società Benefit.
Three plants, one operating context
Their physical proximity makes it appropriate to present the three projects on a single page. Each plant retains its technical identity, while access, inspections and progress monitoring can be coordinated across the entire area.
Documented installation
Photographs dated 14 July 2026 show the fields with structures and modules installed. Aerial views show the extent of the three areas, while ground-level images record the space below the modules and vegetation between and beneath the rows.
Installation is not commissioning
This page describes the observable physical installation as completed. This does not automatically mean that the plants are operational, as commissioning requires checks, tests and grid-connection procedures that cannot be established from a photographic inspection alone. Any operational status will be communicated in a dedicated update.
Project gallery
01 / 04

Sinergia Group - sopralluoghi cantieri, luglio 2026