Bisignano 1 agrivoltaic plant under construction
Bisignano 1 is a 5.99 MWp agrivoltaic project. The inspection on 14 July 2026 documents prepared terraces, internal access routes and the start of structural installation.

Sinergia Group - sopralluoghi cantieri, luglio 2026
- Location
- Bisignano (CS), Calabria
- Status
- Under construction
- Power
- 5.99 MWp
- Companies
- NESS S.p.A. Società Benefit
- Year
- 2026
The Bisignano 1 project involves a 5.99 MWp agrivoltaic plant in Bisignano. Construction activities involve NESS S.p.A. Società Benefit, an operating company of Sinergia Group.
A multi-level construction site
Footage from 14 July 2026 shows the area arranged across terraces and linked by internal routes. This configuration requires careful coordination of work sequences, vehicle movement and structural installation across the different parts of the site.
Documented work
Prepared areas and initial structural elements were visible at the time of the inspection. The project is therefore described as under construction: the available documentation does not yet support declaring installation complete or the plant operational.
From structures to modules
The subsequent phases cover extension of the structures, installation of modules and completion of electrical and grid-connection components. This page will be updated when these stages have been documented and approved for public communication.
Project gallery
01 / 03

Sinergia Group - sopralluoghi cantieri, luglio 2026